Adjustment of Highway 32C, passing through Phu Tho City

Adjustment of Highway 32C, passing through Phu Tho City (km8 + 00-km21 + 100)

Package: Survey, FS, Shop drawing design and cost estimate

Duration: July 2014- August 2014

Contract value: VND 1.6 billion.