Improving capacity of airside at Tan Son Nhat International Airport
Package 01: Survey and feasibility study in the project: "Improving capacity of airside at Tan Son Nhat International Airport"
Agreement cost is VND 3.7 billion
View morePackage 01: Survey and feasibility study in the project: "Improving capacity of airside at Tan Son Nhat International Airport"
Agreement cost is VND 3.7 billion
View morePackage of consultant agreement: Survey and detailed planning formulation of Con Dao Airport in the period from 2020 up to 2030
Agreement cost is VND 1.7 billion
View morePackage 02: technical design of the project: "Constructing apron and ARFF station building behind ALS Cargo termnial at Noi Bai International Airport"
Agreement cost is VND 1.3 billion
View morePackage 02: Survey, technical design of the project: "Repairing runway at Lien Khuong Airport"
Agreement cost is VND 1.6 billion
View morePackage 02: shop drawing design of the project: "Repairing runway at Buon Me Thuot Airport"
Agreement cost is VND 10 billion
View morePackage 01: Survey, technical design of the project: "Improving capacity of airside at Noi Bai International Airport"
Agreement cost is VND 4.7 billion
View morePackage 01: Survey, feasibility study of the project: "Expanding and improving apron at Vinh International Airport"
Agreement cost is 1.1 billion VND
View morePackage 02: Survey, technical design of the project: "constructing apron at land planning site no. 15 at Noi Bai International Airport"
Agreement cost is VND 6.6 billion
View morePackage 01: Survey, feasibility study of the project: "Repairing, constructing taxiway system from taxiway W3 to N1 at Cat Bi International Airport"
Agreement cost is a billion VND.
View morePackage 03: shop drawing design in the project: "Expanding apron in the north and constructing a new taxiway E7 at Danang International Airport"
Agreement cost is a billion VND.
View more